LEGAL NOTICE
BALDWIN-WHITEHALL SCHOOL DISTRICT
BID ADVERTISEMENT
On Tuesday, November 11, 2025, the Baldwin-Whitehall School District will receive bids for Alterations to the McAnulty Elementary School, 5151 McAnnulty Road, Pittsburgh, PA 15236-1817. Bids will be received up to 11:00 A.M., to the attention of Mark Cherpak, Director of Finance and Operations, Baldwin-Whitehall School District, 4900 Curry Road, Pittsburgh, PA 15236.
A Pre-Bid Conference will be held at the site, on Wednesday, October 29, 2025, at 4:00 P.M.
It is the intent of the Owner to enter into separate contracts as follows:
Contract No. 1 General Construction
Contract No. 2 HVAC Construction
Contract No. 3 Plumbing Construction
Contract No. 4 Electrical Construction
Contract No. 5 Technology Construction
Contract No. 6 Asbestos Removal
All bids for Contract No.s 1 through No. 5 shall conform with Contract Documents prepared by HHSDR Architects/Engineers, 40 Shenango Ave., Sharon, PA, 16146, and 201 Century Building, 130 Seventh St., Pittsburgh, PA, 15222. Bidders who contact the Sharon office of HHSDR (724-981-8820) will receive a public link to the Contract Documents. No hard copies will be distributed from HHSDR and no deposit is required.
Bids for Contract No. 6 shall conform with Contract Documents prepared by Intertek-PSI (Professional Service Industries), Environmental & Laboratory Services Building & Construction, 850 Poplar Street, Pittsburgh, PA 15220. Contractors desiring to bid the Asbestos Removal Contract may obtain same by contacting Intertek-PSI at 412-385-0585.
Bids shall include a Bid Security Bond or Certified Check, payable to Baldwin-Whitehall School District, in an amount of ten percent (10%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents.
390028 (10/12,19,26/25)
